PROJECT Profile Pedestrian Bridge Painting

Project:
Owner:
Location:
Service Provided:
Date / Duration:
Compressor Station Piping – Shop Coating
TC Energy
Red Deer, AB
Abrasive Blast and Coating
September-October 2019
Description of Project and Value Added:
The Client was seeking for a qualified contractor for the abrasive blast and coating of the newly fabricated piping spools for a Compressor Station located in Carrot Creek, AB. At the Client’s request, Dalco abrasive blasted and coated all piping spools in accordance with TC Energy specifications and service requirements.
All above-ground systems were prepared in accordance with SSPC-SP6 Commercial Blast Cleaning and coated with a 2-coat system – epoxy primer and a gloss aliphatic polyurethane topcoat, while all insulated and below-ground systems were abrasive blasted in accordance with SSPC-SP10 Near-White Blast Cleaning coated with a two coat system- Two-component, epoxy phenolic tank lining and 2 a part epoxy coating respectively and in compliance with CSA Z245.30-14.
Total Man Hours: 14,500